Day 6 was spent erecting walls on the South side of the haunt. Got most of it up, but was delayed by some of the mods needed for this year's changes.
Day 7 was mostly about the mods. Made another trip to Lowe's and brought home another load of 2x3's. Built some hidden doors on several of the walls to allow easy access to various areas of the haunt during the build and by staff during operation. Made some changes to the coffin table to make it more solid. Still needs to be lowered a good foot or so. My next build day should see the completion of the North, East and South sides minus the outdoor portion on the East side this year. From there we can move on to props, paint and walls for the front side.